Fortune 500 company uses Instrumental to ship in time for Christmas

Fortune 500 company uses Instrumental to ship in time for Christmas

A Fortune 500 Company uses Instrumental to solve a ramp-blocking issue. Where other methods failed to provide definitive root cause, Instrumental came through almost immediately.

With two months until the American holiday shopping season, Company B should have been ramping up production volume in order to meet demand. Instead, the discovery of a troubling product reliability issue during the final stages of development in early summer had thrown that timeline into chaos. Since they had already missed their initial shipment date, getting the product ramped up and shipping in time for Christmas became mission-critical.

Pearl Auto Goes Big on Quality with Instrumental

Pearl Auto Goes Big on Quality with Instrumental

Pearl Auto embraces Instrumental’s advanced quality system, enabling a small team to go big on quality.

During the most critical stage in the lifecycle of its first product, Pearl Automation, a company working to combine sophisticated hardware and software, leveraged Instrumental’s advanced quality control system to maintain high resolution visibility on their production line.  This visibility enabled a small team of engineers to gradually transition daily control of the production line to the China-based contract manufacturer without losing control of build quality.